Independent data center advisory and owner's representation in France and across Europe: grid connection, equipment, permits, local acceptance and crisis management. Named experts, fixed fees, no commission.
How an engagement runs: framing call, NDA, fixed fee →
Expert network · one contact, the right experts
Frédéric ArnaudFounder & coordinator
Single point of contact: scopes each mission and brings in the right experts. Former PwC auditor and Hitachi Consulting consultant, fifteen years in general management.
Xavier WatrelosHV grid connection & industrial projects
Engineer, 20+ years of industrial projects worth €5–100M, including HV and MV grid connections, commissioning and operating permits.
Anis MokdedDesign, commissioning & operations
Engineer, 20+ years in mission-critical sites: led a certified Tier IV data center, then ran hyperscale and AI campuses of 100+ MW.
Nicolas GuillaumeInterconnection & fibre
Founder of a B2B telecom operator with an 800 km fibre network, former France-IX board member, 20+ years in digital infrastructure.
Jean-Yves EgidioConstruction health & safety (HSE)
HSE manager, nearly twenty years on industrial and energy sites: data center builds in Marseille, and a 500-person module yard in the UAE with 15 safety officers.
Francis GillardData center design & audits
Thirty years in HVAC, twenty in data centers: Accredited Tier Designer, design, audits and risk analyses up to 30 MW.
Alain ConstantinidisData center operations & DORA
15+ years running Tier III and Tier IV rooms: operations audits, commissioning, room moves and DORA compliance.
Bertrand GriveletBattery storage & solar
Energy engineer: sizing, business cases and due diligence for solar and battery projects, mainland France and overseas.
Etienne SauvageSolar PV, off-grid sites & commissioning
25 years in solar PV, 300+ missions on grid-connected plants: commissioning, acceptance, expert reports, P50/P90.
Geoffrey GarrigaEnergy compliance & building services
Building services and energy engineer, 15+ years: tertiary decree, regulatory energy audits, BACS, HVAC and electrical design.
Blandine CazellesCrisis communication & public affairs
Founder of a network of senior crisis management experts. Former regional head of communications at La Poste, Senate chief of staff, IHEDN auditor.
Compute ordered ≠ compute installed.
Entering the French market
Your independent partner on the ground in France
International developers, operators and investors often discover French rules late: the RTE queue, permits, local acceptance. We read the original documents in French, visit the site and tell you, in English, what holds and what remains to be confirmed.
Get the guide: building a data center in France →One page on the grid only: the five grid filters.
Project lifecycle
Find where your project stands: what we check at each stage, and the expert involved. One contact coordinates the whole mission.
Announced power, existing connection, zoning, land control: what the site is really worth before a promise or a letter of intent.
Site verification · Brownfields
Experts: Xavier Watrelos, Nicolas Guillaume
Connection request, review of the study or offer, place in the queue, realistic energisation date.
Experts: Xavier Watrelos, Bertrand Grivelet
Zoning, classified installations, water, noise, heat: verifiable figures before the public meeting.
Planning and permits · Local acceptance
Experts: Francis Gillard, Blandine Cazelles
What the connection documents, the tenant and the schedule really commit to, before your committee.
Lender due diligence · Business plan review
Experts: Frédéric Arnaud, Xavier Watrelos
Owner's representation, choice of engineering firms, site health and safety, independent from design and works.
Owner's representative · Engineering procurement · Engineering consultant · Insurers and brokers · Powered real estate · Project tracker
Experts: Anis Mokded, Francis Gillard, Jean-Yves Egidio
Commissioning readiness, operations audit, energy compliance, crisis management.
Commissioning · Operations audit · Crisis
Experts: Anis Mokded, Alain Constantinidis, Geoffrey Garriga, Blandine Cazelles
What we cover
Power, land, demand, local acceptance, local benefits: a data center project is decided on these five questions. We help you answer them with verifiable facts.
You are: Project developer · Investor or lender · Landowner · Local authority · Operator
See also eight assignment examples, with deliverables and durations. New to the topic? What is a data center? Approached about your land? Selling or leasing land.
Our difference
The truth is on the ground
Software spots signals. At GridReadiness, we verify them.
Maps, databases and announcements tell you where to look. They do not tell you whether a substation can really be used, whether works are progressing or whether a date will hold. Our experts go and see, and read the original documents.
Our offers
For lenders and funds
Compute ordered ≠ compute installed
Credit has not disappeared, it is concentrating. At the end of October 2026, property company Merlin Properties raised €3.75bn, backed by its balance sheet and capacity already leased. Lenders are now sorting hard: what matters is no longer announced capacity, but capacity that will actually be connected, built and leased.
Lender due diligence →What we check:
Tools: energisation delay cost · usable IT capacity of a site · project readiness scorecard · PTF request checklist
Our principle: one side of the table
On any project, we work for one client only: the developer, the buyer, the lender or the local authority, never two of them. We take no commission, on equipment, land or capacity. Our fees are fixed and paid by the party we advise. We do not market projects, project companies or subscriptions: we are paid for advice only.
Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.
We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.
Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.
Intelligence Library
★ Flagship analysis · Lenders & developers
Compute ordered is not compute installed.
The banks now agree.
Jefferies, Morgan Stanley and Goldman Sachs now measure the gap between chips sold and data centers delivered.
September 2026 · 8 min read
Read the analysis →
Hosting · Method
"AI-Ready": ten questions to ask before signing
October 2026 · 5 min
Analysis · Financing
The neocloud credit squeeze: what it would change for sites in France
October 2026 · 6 min
Analysis · Financing
Stranded compute: when GPUs arrive before the grid
October 2026 · 5 min
THE GRIDREADINESS MONTHLY LETTER
Grid connection, equipment and data center projects in France: what matters, once a month.
Your email is used only for this letter. Legal notice.
Thank you, you are subscribed.
Sending failed. Email fred@gridreadiness.com.
EUROPEAN TRANSFORMER LEAD TIME INDEX
Lead times for 14 transformer product lines, updated every quarter. Q3 2026 edition now available.
Get the latest edition now, and the next ones by email when they are published.
Thank you. Your copy is ready: Download the Lead Time Index (PDF) →
Sending failed. Email fred@gridreadiness.com and we will send it to you.
FAQ
GridReadiness is a data center consulting and owner's representative pure player in France and Europe, independent from design and construction and backed by an expert network, from grid connection to crisis management. Led by Frédéric Arnaud, the client's single point of contact, it covers site selection and preparation, RTE and Enedis connection, the design brief and engineering procurement, project steering, commissioning, operations audits, lender due diligence and support for public bodies, bringing in independent experts as each mission requires.
For a large load, several years. The timeline depends mainly on the connection document obtained (exploratory study, accepted offer or signed agreement), the grid works required and their permits, and high-voltage equipment lead times. RTE's fast-track HTB3 procedure targets three to four years for 400 MW to 1 GW on selected sites.
Data center developers and operators, EPC contractors and electrical integrators, infrastructure funds, lenders, battery storage developers, and the municipalities and public bodies hosting a project. Never, on the same project, for both the developer and the host community.
We take no commission on equipment or site transactions, we never act for both sides of the same project, and every mission is scoped in writing (scope, deliverables, timing) before it starts. If one of our experts is on assignment with a developer or an EPC contractor, we do not carry out the due diligence of that same project for a lender, nor support the host community on it.