A data center can secure its power and still be blocked by its land: unsuitable zoning in the local plan (PLU), a challenged building permit, an incomplete ICPE file for generators, water questions. These procedures must run alongside the grid connection, not after it.

DOES YOUR SITUATION LOOK LIKE ONE OF THESE?

Xavier WatrelosXavier Watrelos
HV grid connection & industrial projects
Blandine CazellesBlandine Cazelles
Crisis communication & public affairs
All situations →

WHAT WE MANAGE

On the owner's side Local plan (PLU) review: buildability, height, footprint, parking
PLU modification, revision or alignment, with the municipality
Building permit file, with the architect and engineers
ICPE file: generators, fuel storage, batteries, cooling
Environmental authorisation, impact study, public inquiry
Follow-up of requests from the State, the municipality and engineers

Legal work goes to partner lawyers who bill the client directly. See data center permits in France and grid connection engineering.

WHO IS INVOLVED

Xavier Watrelos, who has led operating permits with public inquiry on industrial projects, partner lawyers and architects, coordinated by Frédéric Arnaud. Best-efforts obligation: planning decisions belong to the municipality and the State.

FREQUENTLY ASKED QUESTIONS

Does a data center need a zoning change in France?

Not always. It depends on zoning, height, footprint and use rules. A local plan review tells whether the project works as is or needs a modification.

Is a data center an ICPE in France?

Usually yes, through its installations: generators, fuel storage, some cooling or energy storage systems. The regime depends on capacities and quantities.