The five questions that decide a project
Offer · Positioning a project on real demand
A data center without a customer is land with a grid connection. The type of customer, hyperscaler, colocation operator, AI player or enterprise, sets capacity, density, schedule and how the project is financed. We help position a site on realistic demand, or choose the right capacity if you are the user.
You receive:
- the site's realistic use given its capacity, date and connectivity
- the technical requirements of that use: density, cooling, redundancy, fibre
- an assessment of tenant strength and of the site's reuse potential
- for a user: requirements and comparison of offers
First conversation confidential and with no commitment. Fixed fees proposed in writing before any assignment. Best-efforts obligation.
The problem. Many projects start from land and power, then look for a customer. Yet each customer type has its own requirements: a hyperscaler imposes its specification, an AI player wants very dense racks fast, an enterprise looks for proximity. A site designed for the wrong use leases poorly or converts at high cost.
FOUR TYPES OF DEMAND
Campuses of several hundred MW, imposed specifications, schedule driven by their programme. They often buy land or a ready-to-build project.
Several tenants in one building, gradual ramp-up. Connectivity and proximity matter as much as power.
Racks of 100 kW and more, liquid cooling, urgent need. Financial strength varies widely.
1 to 20 MW, proximity, data sovereignty, sometimes a second backup site.
QUESTIONS TO ASK
Is the tenant strong, and what is the site worth if it leaves?
Do the site's capacity, date and density match this customer? See the usable power calculator
Can the site serve another use without a rebuild?
For a user looking for capacity: capacity procurement support. For an owner or developer: site readiness pack.
WHO IS INVOLVED

Anis Mokded
Design, commissioning & operations
Engineer, 20+ years in mission-critical sites: led a certified Tier IV data center, then ran campuses above 100 MW. Read profile →

Frédéric Arnaud
Founder & coordinator
Single point of contact: scopes each mission and brings in the right experts. Former PwC auditor and Hitachi Consulting consultant. Read profile →
HOW IT WORKS
WHAT WE COMMIT TO
Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.
We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.
Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.
FREQUENTLY ASKED QUESTIONS
Can a data center without a customer be financed?
With more difficulty. A signed lease with a strong tenant is often the condition for debt financing. Without a customer, the project relies on equity or on a sale to an operator.