Before meeting the prefecture, the municipality, RTE or an investor, you need to show the project: how many megawatts the site can take, where the buildings and substation go, where access runs, how the project fits into the landscape. A drawing beats ten pages of text.
The capacity test-fit answers these questions in a few weeks, without committing to the heavy studies of an architect or design firm.
WHAT THE TEST-FIT INCLUDES
Outline layout: buildings, substation, generators, access, construction footprint
Phasing: what can be built first, and what follows
Section and heights, to judge visibility
Optional landscape views by a visualiser: aerial view and ground-level views
"Working document, non-binding outline" on every sheet
WHAT IT IS FOR
Presenting the project at a scoping meeting with State services or the municipality; preparing the RTE connection request; showing the site's potential to investors or developers; testing several scenarios before hiring an architect. Before the test-fit, check the 13 red flags.
WHO IS INVOLVED
Xavier Watrelos, grid and high-voltage engineer: outline layout, substation, access and phasing.
A visualiser from the network, for modelling and landscape views.
Frédéric Arnaud coordinates the assignment and remains your single point of contact.
HOW WE WORK
A fixed-fee written proposal, with a delivery date and two rounds of corrections. The test-fit is a basis for discussion: it replaces neither RTE's studies, nor an architect's work, nor permits. A best-efforts obligation stated in writing.
FREQUENTLY ASKED QUESTIONS
How long does a capacity test-fit take?
Usually two to three weeks after receiving the site documents (land registry plan, zoning, photos).
Does the test-fit bind the future project?
No. It is a non-binding working document, designed to be discussed and adjusted with the State, the municipality and the future developer.
Do we need an architect?
Not at this stage. The architect comes in for the design and building permit, once phasing and the developer are settled.