Geoffrey Garriga

Energy compliance, building services and BACS decree

South-eastern France
Languages : French
Field : Energy & compliance

15+years in building services and energy engineering
240beds: hospital construction
1,500seats: Olympic indoor pool complex
290 kWBACS decree threshold he audits against

WHAT HE DOES

Geoffrey Garriga is a building services and energy engineer. For more than fifteen years he has designed and managed building projects from design to handover: heating, ventilation, air conditioning, plumbing, power and low-current systems, building management systems. He works on commercial buildings, public facilities, hotels and housing, in new build as well as refurbishment of occupied sites.

WHAT HE BRINGS TO A DATA CENTER

The French tertiary decree and the OPERAT platform. Commercial buildings over 1,000 m² must cut energy consumption by 40% by 2030, 50% by 2040 and 60% by 2050. Geoffrey analyses how the site actually runs, simulates possible savings and builds action scenarios, including target modulation files where the activity justifies it.

The BACS decree. Since 2025, commercial buildings with heating or cooling systems above 290 kW must have a building automation and control system. He audits existing installations, then designs, sizes and integrates these systems.

Regulatory energy audits, based on actual consumption and dynamic thermal simulation, with a whole-life cost approach.

Design and supervision of technical packages: HVAC, electrical, lighting, security and networks, from feasibility to handover, including specifications, bid analysis and site supervision.

Operation contract oversight: defining service levels, checking delivery and performance commitments over time.

SELECTED REFERENCES FROM HIS CAREER

Tertiary decree support for an Enedis office site in Montpellier; HVAC and electrical refurbishment of the Galeries Lafayette store in Montpellier; construction of a fire station in Mimet; construction of a 240-bed hospital; construction of an Olympic complex with a 1,500-seat indoor pool; construction of a five-star hotel; whole-building energy retrofits of residences and condominiums in Provence.

WHO HE WORKS WITH

Data center operators, especially enterprise and mid-size sites, commercial building owners and asset managers who want to secure their regulatory deadlines and improve the performance of their installations.

HOW HE WORKS

Geoffrey works within the GridReadiness network, which remains your single point of contact, mainly in south-eastern France. Every assignment is set out in a written proposal.

← All our experts · The expert network