Etienne Sauvage

Rooftop solar, off-grid sites and commissioning

Centre-Val de Loire, France · assignments in France and abroad
Languages : French, English
Field : Energy & compliance

25years in solar PV, since 2001
300+technical missions on grid-connected installations
0–1 MWprooftop installations, the core of his work
20+countries worked in

BACKGROUND

Etienne Sauvage is an engineer, a graduate of ESPCI Paris with an advanced master's degree in renewable energy. Since 2001 he has designed, built, accepted and assessed solar PV systems: grid-connected installations, off-grid and hybrid systems, mini-grids. He has carried out more than 300 technical missions on grid-connected installations, mostly in France, on ground-mounted plants of 5 to 30 MWp and rooftops of 3 to 850 kWp. Rooftop solar up to 1 MWp and the electrification of off-grid sites now make up most of his work.

He runs an engineering firm specialised in solar energy and has worked for twenty-five years in more than twenty countries, for public and private project owners and for major international funders. A certified QualiPV trainer since 2007, he has trained several hundred installers and engineers, and has contributed to methodological guides and international standards on electrification.

WHAT HE BRINGS TO A PROJECT

Commissioning and acceptance: pre-commissioning checks, tests and technical acceptance of installations connected at low voltage or medium voltage (HTA), in coordination with the grid operator.

Technical expertise and diagnosis: analysis of complex malfunctions, expert reports for project owners, their legal teams and insurers, instrumentation to measure an installation's real performance.

Yield studies and due diligence: production forecasting models, P50 and P90 analyses, independent contradictory studies for large plants, valued by banks and investors.

Electrification of off-grid sites: design, sizing and commissioning of off-grid systems and mini-grids combining solar, batteries and generators, for isolated sites or sites poorly served by the grid.

WHO IT IS FOR

Companies and public bodies equipping their rooftops, owners of isolated sites to electrify, solar producers and installers, including foreign companies delivering a project in France, public and private project owners, lenders and investors financing plants, insurers needing an independent expert opinion.

HOW HE WORKS

Etienne works within the GridReadiness network, which remains your single point of contact, on one-off or longer assignments, subject to availability, in French or English. He can bring in engineers he works with regularly. Each assignment is set out in a written proposal.

← All our experts · The expert network