You need an experienced engineer on a specific point of your data center project in France: reviewing a grid connection offer, preparing a request to RTE, checking a single-line diagram, choosing transformers, preparing commissioning. A large engineering firm is not always the answer: the scope is too broad and you do not choose the team. And hiring makes no sense for a few weeks of work.
GridReadiness provides named engineering consultants specialised in data centers, whom you know before signing. Each assignment is coordinated by a single point of contact and set out in a written proposal.
WHAT AN ENGINEERING CONSULTANT DOES FOR YOUR DATA CENTER
Power: MVA to MW IT conversion, phasing, first phase on the distribution grid, temporary power
Design review: power distribution, backup, cooling, redundancy
High-voltage equipment: transformers, substations, manufacturing and delivery lead times
Commissioning and operations: testing, acceptance, procedures, operations audits
Energy and compliance: energy audits, PUE, French tertiary decree, building controls
On-site solar and storage: sizing, connection, commissioning
To check a stated capacity, see our MVA to MW IT converter.
THREE WAYS TO WORK WITH A CONSULTANT
Fixed-price assignment. One question, one deliverable: review of a connection offer, technical note, installation audit.
Part-time. A few days a month alongside your project team, for the length of a phase. See our Readiness Manager.
Long-term support. An engineer embedded in your team for a full phase. See expert staffing.
ENGINEERING CONSULTANT, DESIGN FIRM OR LEAD DESIGNER?
An engineering consultant advises, checks, prepares files and represents the developer with the grid operator, the authorities and contractors. They do not sign construction drawings or carry design liability: that is the role of the lead designer, who is insured for it. GridReadiness stays on the advisory side, with no design liability. That is what lets us review other parties' work independently.
The two work together: many developers call us before choosing their data center engineering firm, then during the studies. For an overview, see our data center consulting firm page.
THE NETWORK'S CONSULTING ENGINEERS
Xavier Watrelos, HV grid connection: 20+ years of industrial projects from €5m to €100m, including HV and MV connections, commissioning and operating permits.
Anis Mokded, design and operations: led a certified Tier IV data center, then ran campuses above 100 MW.
Francis Gillard, cooling and audits: thirty years in HVAC, twenty in data centers, feasibility studies and risk analyses.
Geoffrey Garriga, energy and utilities: energy and HVAC engineer, regulatory audits, HVAC and electrical design.
Alain Constantinidis, operations: more than fifteen years running Tier III and Tier IV facilities, commissioning, operations audits and procedures.
Bertrand Grivelet and Etienne Sauvage, solar and storage: sizing of solar and battery storage projects, commissioning and acceptance of grid-connected installations.
Full profiles: our experts.
HOW WE WORK
A fixed-price written proposal with the named engineer before each assignment. No commission on land, equipment or contractors. A best-efforts obligation, stated in writing: decisions by RTE, Enedis and the authorities are not ours.
Typical situations: An HV engineer a few days a month · A 40 MVA substation: how many IT MW?
FREQUENTLY ASKED QUESTIONS
What is an engineering consultant?
An experienced engineer who works on assignment to advise, check or prepare a technical file, without being the client's employee or the project's lead designer. On a data center, the work usually covers grid connection, design review, equipment and commissioning.
Why an engineering consultant rather than a design firm?
For a specific question, an independent opinion or support during a phase. The design firm draws and carries the project; the consultant prepares, checks and represents the developer. The two work together.
Do you work across France?
Yes, across mainland France, and case by case in Europe. Our engineers travel to site when useful.
Do you work on projects other than data centers?
Yes, on grid connection for industrial sites, battery storage and solar projects, with the same engineers.