Many data centers built ten or fifteen years ago were designed for racks of a few kilowatts. Customers now ask for GPU racks of tens of kilowatts, liquid cooled. Densifying can be faster than building, if you know what the site can really take.

DOES YOUR SITUATION LOOK LIKE ONE OF THESE?

Anis MokdedAnis Mokded
Design, commissioning & operations
Francis GillardFrancis Gillard
Data center design & audits
All situations →

THE QUESTIONS TO SETTLE

Before works start Power: headroom on the current connection, or a new request
Power distribution: switchgear, UPS, generators to reinforce or replace
Cooling: direct-to-chip liquid, loops, CDUs, chillers
Structure: floor loading, height, routes for services
Live-site works: phasing, shutdowns, risks for existing customers
Economics: cost, duration, expected revenue, versus a new build

See AI factory in France and operations audit.

TOTAL COST OVER TIME

Price per kilowatt does not tell the whole story. Over a contract or operating life, architecture choices weigh most: energy and cooling efficiency, upgrades to follow rising densities, liquid cooling maintenance, and exit terms. We cost them over the full term, so options are truly comparable.

Densifying: orders of magnitude Conventional IT loads ran at about 5-10 kW per rack; GPU loads exceed 140 kW, with sharp swings (Vertiv)
Air works up to about 25 kW per rack, intermediate solutions up to 45 kW; rear-door heat exchangers can densify an existing site without a full rebuild (Schneider Electric, Legrand)
A data center is designed for twenty to thirty years, while IT renews much faster (Fabien Laleuf, ABB France)

Source: J3e no. 929, October 2026, "AI, an infrastructure revolution" (in French).

FREQUENTLY ASKED QUESTIONS

Can an existing data center move to liquid cooling?

Often, but not everywhere. Power, distribution, structure and the ability to work without disrupting existing customers must be checked.