Offer · Site verification before signing

DOES YOUR SITUATION LOOK LIKE ONE OF THESE?

Xavier WatrelosXavier Watrelos
HV grid connection & industrial projects
Frédéric ArnaudFrédéric Arnaud
Founder & coordinator
All situations →

A site or project is offered to you with "X MW available". Before signing a promise, a letter of intent or financing, we check on documents what that capacity is worth, and what still has to be obtained.

You receive:

  • what the connection documents provided actually say
  • usable capacity for a data center, cooling and redundancy included
  • planning, permitting and local acceptance risks on the site
  • the questions to put to the seller and the grid operator

First conversation confidential and with no commitment. Fixed fees proposed in writing before any assignment. Best-efforts obligation.

Open calculator: estimate a site's usable IT capacity.

Download or fill in: your project readiness scorecard (12 questions).

A teaser says "100 MW grid connected", "power confirmed by RTE" or "ready to energise". Behind the same words sit very different documents, and years of difference in the energisation date. Buyers often find out once committed. Before signing an option, a letter of intent or a financing, one question matters: which document proves this power, and what does it actually secure?

THE PROBLEM: SAME WORDS, VERY DIFFERENT DOCUMENTS

What "connected" can mean in France An RTE exploratory study: an indication that reserves no capacity
A connection request filed: a process started, with no place in the queue
An accepted connection offer (PTF): a queue position and reserved capacity, to be maintained every year
A signed connection agreement: a firmer commitment on works and timing
Emails or a meeting with the grid operator: no binding value

See which connection document actually secures a site.

100 MW, BUT OF WHAT?

Three figures that do not mean the same thing Connection capacity: the figure in the PTF or connection agreement with RTE or Enedis. It is a ceiling, not a consumption
Facility power: what the data center draws in total, including cooling and losses
IT load: what actually powers the servers, and therefore what can be leased or sold
PUE links them: with 100 MW in total and a PUE of 1.25, 80 MW is left for IT; the remaining 20 MW goes to cooling, electrical losses and support systems

In France, one more rule applies: RTE can cap the connection capacity at 125% of the capacity the project can justify. A site marketed as "100 MW connected" may therefore match neither what the grid guarantees nor what the servers will receive. The first question remains: which megawatts, and on which document? See queue position.

Investor or lender? See also lender due diligence and business plan review.

Is the site a former factory? See brownfield: what the MW are really worth.

WHAT WE CHECK

The document behind the claim: type, date, power, connection point, conditions and stated cost. The holder: which company the request is in, and whether it is the one you are buying or financing; RTE and Enedis procedures set no rule for transfer to another applicant, so this is settled in the contracts, with a lawyer. The queue position: entry date, payments, annual maintenance, land control, justified power. See keeping a queue position. A realistic energisation date: grid works, substation to build or reinforce, large transformer lead times of 48 to 60 months in Europe. See transformer lead times. What is missing: permits, appeals, conditions, phased or limited power.

WHAT YOU RECEIVE

A short note, before you sign For each point: proven by a document, only stated, or missing
An energisation date range, with its assumptions
The red flags in the file
Written questions for the seller and documents to require
A debrief call

Fast document review, usually one to two weeks depending on the file, fixed fee. To compare several sites, see site screening and score; for financing, lender due diligence.

OUR RULES

No commission on any land or project, and never working for the seller of a site we check for you. Our reading is technical and is not legal advice; RTE and Enedis decisions are not ours. Best-efforts obligation.

WHO IS INVOLVED

Xavier Watrelos reads the RTE and Enedis documents, coordinated by Frédéric Arnaud, with a partner lawyer when transfer or contracts raise questions. See also distressed project acquisition.

HOW IT WORKS

A first conversation. You describe the project and the decision at stake. We tell you whether we can help, and who will be involved.
A confidentiality agreement. Signed before you send us any document.
A written, fixed-fee proposal. Scope, deliverables, timeline and fees set in advance: no open-ended time-based billing.
The assignment and debrief. A written deliverable, a debrief session, and the questions to put to the grid operator or your partners.

WHAT WE COMMIT TO

Recent assignments

Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.

Independence

We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.

Framework

Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.

Our difference

The truth is on the ground

Software spots signals. At GridReadiness, we verify them.

Maps, databases and announcements tell you where to look. They do not tell you whether a substation can really be used, whether works are progressing or whether a date will hold. Our experts go and see, and read the original documents.

  • site and substation visits: equipment condition, nameplates, progress of works, posted permits
  • reading the original documents: connection studies and proposals, agreements, manufacturer quotes
  • the experience of people who have delivered grid connections, commissioning and construction
  • a written opinion that separates what is verified from what remains to be confirmed

DESCRIBE YOUR SITUATION

A few lines are enough: the project, the document or decision at stake, and your deadline. We come back to you to set up a first conversation.

First conversation confidential and with no commitment. Fixed fees proposed in writing before any assignment. Best-efforts obligation.

Density and architecture: why connected MW are not usable MW An NVIDIA GB300 NVL72 rack draws about 142 kW, a Vera Rubin rack up to 246 kW; manufacturers talk of one megawatt per rack in time
According to Schneider Electric, air cooling works up to about 25 kW per rack, intermediate solutions up to 45 kW, beyond that liquid cooling is needed
According to ABB, at equal connected capacity, every megawatt lost in conversion is a megawatt less for compute; a study with BCG puts the gain from DC distribution above 5% (manufacturer estimate)
See also Time to Connect: what really sets the date

Source: J3e no. 929, October 2026, "AI, an infrastructure revolution" (in French).

Why it now matters: Norway pauses data center grid reservations.

FREQUENTLY ASKED QUESTIONS

Does a 'connected' site always have an accepted connection offer?

No. The word is used for very different documents: exploratory study, filed request, accepted offer, signed agreement. Only an accepted and maintained offer gives a place in RTE's queue.

How long does the check take?

Usually one to two weeks on documents, depending on how many are provided and their quality.

Do you also work for sellers?

Not on the same site. We never check, for a buyer, a site whose seller we advise.