Warehouse and commercial rooftops, car park carports, ground-mounted plants, solar coupled with batteries: above 36 kVA, solar projects change scale. Grid connection, acceptance and real performance can no longer be checked from a quote.
Owners, investors and insurers need a view from someone who sells no panels, batteries or works. GridReadiness provides named solar PV engineers, independent of installers.
WHAT WE DO
Review of the grid connection offer at low or medium voltage: capacity, timeline, costs, works at your expense
Independent review of the technical file before the French electrical safety certificate (Consuel): single-line diagram, protections, equipment
Pre-commissioning checks, testing and acceptance, at low or medium voltage
Investigation of underperformance, faults or claims, for the owner, its lawyers or its insurer
P50 and P90 yield studies, technical review before financing or acquiring a plant
BEFORE FILING: WHAT TO CHECK
A solar or battery application can be refused, or stalled at grid connection, for reasons visible from day one. Before any filing, we check:
Heritage protections: surroundings of listed monuments, protected sites, opinion of the heritage architect (ABF)
Easements and risks: flooding, fire, buried networks
The authorisation regime that fits the project size, especially for batteries
Grid capacity at the connection point and distance to the substation
The same logic applies to large plots: see our site red flags.
FRENCH SOLAR OBLIGATIONS
Two obligations now drive much of the demand. They add up and cannot be offset against each other.
Outdoor car parks above 1,500 m² must carry solar carports over at least half their surface, or a mixed solution with trees. The deadline is 1 July 2026 for car parks above 10,000 m² and 1 July 2028 for the others. Exemptions and deferrals exist, under conditions.
New buildings, extensions and major renovations above 500 m² of footprint (retail, industrial, warehouses, offices, public buildings among others) must cover part of their roof with solar or vegetation: 30%, then 40% from 1 July 2026 and 50% from 1 July 2027, depending on the date of the planning application. An obligation for existing buildings is planned for 1 January 2028.
Source: photovoltaique.info, pages on car parks and buildings (in French), updated September 2026. A bill under discussion may still change these rules: each case is checked at project time.
THE ENGINEERS INVOLVED
Etienne Sauvage, commissioning and expert reports: 25 years in solar PV, 300+ technical assignments on grid-connected systems, rooftop and ground-mounted. Commissioning and acceptance at low and medium voltage, expert reports, P50 and P90 studies. Certified QualiPV trainer since 2007.
Bertrand Grivelet, sizing and storage: energy engineer, solar-plus-storage projects up to 3 MWp, business models, knowledge of French overseas non-interconnected grids.
Xavier Watrelos, grid connection: 20+ years of industrial projects, including HV and MV connections and commissioning.
HOW WE WORK
We are not installers and sell no equipment. A fixed-fee written proposal with the named engineers, no commission on equipment or works. A best-efforts obligation stated in writing.
FREQUENTLY ASKED QUESTIONS
Do you file planning declarations and Consuel applications?
That is not our business. We check blocking points before filing and review the technical file. The filing itself usually stays with the installer or an administrative service provider.
Can we ask for a single one-off check?
Yes: an acceptance, an underperformance investigation, a grid connection offer review or a yield study can be ordered on its own.
What installation sizes?
From rooftops of a few tens of kWp to ground-mounted plants of several tens of MWp, with or without batteries.
Is my car park covered by the carport obligation?
If it exceeds 1,500 m², probably. Exemptions (heritage, technical constraints, excessive cost) are checked case by case, with a techno-economic study where required.
Do you work in French overseas territories?
Yes, depending on the assignment. Non-interconnected zones have their own grid connection rules, known to an expert in the network.