Insuring a data center under construction or in operation means judging very specific risks: grid connection, backup power, cooling, commissioning, how operations are run. Questionnaires and the files provided by the insured are not always enough to form a view, especially on French projects, where the grid connection timeline sets the real pace of the site.

GridReadiness provides brokers and insurers with named engineers specialised in data centers, for independent risk surveys and technical reviews, on a fixed fee.

WHAT WE DO

What we review for you Risk survey before underwriting or at renewal: electrical and thermal design, redundancy, backup power
Grid connection: RTE or Enedis timeline, interim solutions, risk of delayed start-up
Construction and commissioning: testing, acceptance, operational readiness
Operations: procedures, maintenance, incident management, team organisation
After an incident: technical support to the root-cause analysis, alongside the appointed loss adjuster

WHAT YOU RECEIVE

A written report, in English or French: survey findings, a risk assessment by topic and prioritised loss-prevention recommendations. A video debrief with the engineer who carried out the survey.

Grid connection deserves particular attention in France. A connection delay pushes back start-up and weighs directly on delay-in-start-up cover. See our energisation delay cost calculator and our grid connection glossary.

WHO IT IS FOR

Brokers, insurers and reinsurers, and their construction, property and energy underwriters. The same work also serves lenders: see our lender due diligence.

THE ENGINEERS INVOLVED

Xavier Watrelos, HV grid connection and commissioning: 20+ years of industrial projects, including HV and MV connections and commissioning.

Anis Mokded, design and operations: led a certified Tier IV data center, then ran campuses above 100 MW.

Alain Constantinidis, operations: more than fifteen years running Tier III and Tier IV facilities, operations audits and procedures.

Francis Gillard, cooling: thirty years in HVAC, twenty in data centers, feasibility studies and risk analyses.

Full profiles: our experts.

INDEPENDENCE

Fixed fees, with no commission or remuneration linked to placing the risk. Before each assignment, we check that no expert in the network works for the insured, its contractor or its operator. Information received stays confidential. A best-efforts obligation, stated in writing.

Typical situations: Construction insurance for a 60 MW data center: grid delay risk · Two outages in a year: a risk survey before renewal

FREQUENTLY ASKED QUESTIONS

On whose behalf do you work?

On behalf of whoever instructs us, usually the broker or the insurer. The report is addressed to them; the insured is informed of the survey and gives us site access.

Do you replace the risk engineer or the loss adjuster?

No. We bring specialist data center expertise alongside your teams. After an incident, we support the appointed adjuster on the technical analysis.

Are reports available in English?

Yes, in English or French, depending on the recipient.

Where do you work?

In France, and case by case in Europe. Engineers travel to site.