A warehouse or industrial site is increasingly let and valued on its electrical power: HGV and van charging, refrigeration, automation, rooftop solar, storage, and tomorrow computing uses. Yet the power available from Enedis or RTE, the time needed to increase it and its cost are rarely known precisely when buying, leasing or starting works.
GridReadiness provides owners, investors and occupiers with named engineers who verify on site what the property can really receive, and how fast.
THE QUESTIONS WE ANSWER
Power upgrade: process, timeline, indicative cost, possible move to high voltage
Rooftop and car park solar: sizing, connection, self-consumption or export
Battery storage: peak shaving, resilience, making the most of grid capacity
HGV and fleet charging: power to plan for and phasing
Conversion: potential of a warehouse for more power-intensive uses, up to a data center
WHAT FRENCH REGULATION ALREADY REQUIRES
When building, extending or heavily renovating, warehouses and industrial buildings above 500 m² must cover part of their roof with solar panels or vegetation: 40% since 1 July 2026, 50% from 1 July 2027 (article L. 171-4 of the French construction code). Outdoor car parks above 1,500 m² must be fitted with solar canopies, on a timetable set by their size.
These obligations make grid connection an immediate question: rooftop solar, chargers or batteries all need a grid able to take them.
WHAT YOU RECEIVE
An investment-committee-ready note per site: verified available power, upgrade scenarios with timelines and orders of magnitude, solar and storage potential, risks and next steps. For an owner looking to market land or a building, see also our site readiness pack.
THE ENGINEERS INVOLVED
Xavier Watrelos, grid connection: 20+ years of industrial projects, including HV and MV connections and commissioning.
Bertrand Grivelet and Etienne Sauvage, solar and storage: sizing of solar and battery storage projects, connection requests, commissioning and acceptance.
Geoffrey Garriga, energy and regulation: energy audits, French tertiary decree, building controls.
Frédéric Arnaud, investment: financial reading of the scenarios and due diligence for investors.
HOW WE WORK
A fixed-fee written proposal, per site or per portfolio, with the named engineers. No commission on equipment, installers or energy contracts: we sell neither panels nor batteries. A best-efforts obligation stated in writing: decisions by Enedis and RTE are not ours.
Typical situations: 14 warehouses: which can host HGV charging? · 6,000 m² roof renovation: connecting mandatory solar
See also: independent solar PV engineering.
FREQUENTLY ASKED QUESTIONS
How do you find out the power available on a site?
The contract and delivery substation give the subscribed power. Grid capacity nearby is checked with Enedis or RTE, using public hosting-capacity data and, where needed, a connection study. We cross-check these and verify them on site.
How long does a warehouse power upgrade take in France?
It depends on the power requested and the local grid: from a few months for a modest medium-voltage upgrade to several years if grid reinforcement or a move to high voltage is needed. That is precisely what we assess site by site.
Do you sell solar installations or batteries?
No. We are independent from installers and suppliers: we size, verify and support, with no commission.
Do you work across a portfolio of sites?
Yes. We rank sites by potential and grid constraints, then go deeper on the most promising ones.