Your customers want denser racks, often for AI. Building a new site takes years; densifying the existing one can take months. But you need to know where the real limit lies: contracted grid capacity, delivery substation, transformers, distribution, UPS, generators or cooling.

A capacity study answers a simple question: how many additional IT megawatts, at what cost, how fast, and which element limits first.

WHAT WE CHECK

From the grid boundary to the rack Grid connection: subscribed power, available margin, conditions for an increase with Enedis or RTE
Substation and transformers: capacity, age, extension options
Distribution and UPS: real margins, redundancy levels maintained
Generators and fuel storage
Cooling: capacity, possible move to liquid cooling for AI racks
Space, structure and operating constraints during works

For a first order of magnitude, see our MVA to IT MW converter. AI loads also raise specific questions: see our article on load oscillations.

WHAT YOU RECEIVE

Quantified additional capacity, with its assumptions and the redundancy maintained; the bottlenecks in the order they appear; works scenarios with timelines and order-of-magnitude costs; the steps to take with the grid operator if a power increase is needed.

THE ENGINEERS INVOLVED

Xavier Watrelos, grid connection and high voltage: 20+ years of industrial projects, including HV and MV connections and commissioning.

Anis Mokded, design and operations: led a certified Tier IV data center, then ran campuses above 100 MW.

Francis Gillard, cooling: thirty years in HVAC, twenty in data centers.

HOW WE WORK

A fixed-fee written proposal with the named engineers. No commission on equipment or works. A best-efforts obligation stated in writing.

Typical situations: 3 MW of AI racks in a 6 MW site · a 40 MVA substation, how many MW?

FREQUENTLY ASKED QUESTIONS

How long does a capacity study take?

Usually two to four weeks, depending on site size and available documentation, with at least one site visit.

Can an existing data center host AI racks?

Often yes, in part of the site, provided power per rack, cooling and electrical distribution are checked. The study says how much and on what conditions.

Do we necessarily need more power from the grid?

Not always. Part of the margin sometimes lies within the installation itself. If an increase is needed, the study sets out the process and its likely timeline.

Do you work while the site is operating?

Yes, with no service interruption: visits and surveys are organised with your teams.