DOES YOUR SITUATION LOOK LIKE ONE OF THESE?
You need data center capacity: a room, racks or a full hall for AI. We write your requirements, consult operators and compare offers on what is proven, not what is promised. We are paid by you alone: no commission from operators.
You receive:
- a requirements brief: power, density, cooling, location, latency, timeline
- the list of operators to consult and management of the tender
- a comparison of offers: capacity actually available, grid connection, contract, risks
- a written recommendation and support for the negotiation
First conversation confidential and with no commitment. Fixed fees proposed in writing before any assignment. Best-efforts obligation.
A company hosting AI servers must choose between colocation offers, or between colocation, its own site and cloud. All claim to be AI-ready. The gaps show later: in the energy bill, cooling limits, or when moving to the next server generation.
WHAT WE DO
Requirements and provider tender
Comparison grid: proven, merely promised, still to verify
Technical visits of shortlisted sites
Total cost over the contract: energy, cooling, upgrades, exit terms
Written recommendation and points to negotiate
See "AI-Ready": ten questions to ask before signing and pre-lease audit. We are paid only by the client company, never by providers.
HOW IT WORKS
WHAT WE COMMIT TO
Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.
We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.
Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.
Can power distribution evolve without rebuilding? According to Vertiv, DC distribution only pays off above about 600 kW per rack, and European colocation sites must serve AC and DC customers alike
Will the site follow several chip generations? A data center is designed for twenty to thirty years, while IT technology renews much faster (Fabien Laleuf, ABB France)
Source: J3e no. 929, October 2026, "AI, an infrastructure revolution" (in French).
FREQUENTLY ASKED QUESTIONS
What does "AI-Ready" mean for a data center?
There is no shared definition. Bring the label back to concrete parameters: power per rack, cooling, available power and date, ability to evolve.