Typical situation no. 97
An owner is starting a heavy roof renovation on a 6,000 m² warehouse. Regulation requires part of the roof to be covered with solar panels. He has received two installer quotes proposing different capacities and connection approaches.
WHAT IS BLOCKING
- The share of roof to cover depends on the date of works and the type of building.
- Exporting to the grid or self-consuming do not require the same steps with Enedis.
- The installers' quotes are hard to compare.
WHAT WE DO
- Check of the applicable obligation and the area to cover.
- Analysis of the site's consumption and existing connection.
- Comparison of the two quotes: capacity, expected output, connection, warranties.
- Assessment of whether battery storage makes sense.
WHAT YOU GET
- A clear note on the obligation and the best-suited solution.
- A like-for-like comparison of the quotes.
- The connection steps to start with Enedis.
Proposed format: Scoping note and comparison, two weeks. Every assignment is scoped in writing before it starts.