Typical situation no. 96
A logistics landlord is getting requests from tenants to install HGV chargers. Each site has a different electricity contract, often low or medium voltage. The landlord does not know which sites can take several megawatts, at what cost or how fast.
WHAT IS BLOCKING
- A site's subscribed power says nothing about the capacity of the Enedis grid nearby.
- A power upgrade can take a few months or several years depending on the local grid.
- Each tenant asks separately, with no view across the portfolio.
WHAT WE DO
- Collection of contracts, delivery substations and public grid capacity data.
- Ranking of the 14 sites by accessible power and likely timeline.
- Visits to the most promising sites and preliminary discussions with Enedis.
- Assessment of battery storage to limit the power to request.
WHAT YOU GET
- A portfolio ranking, site by site.
- For selected sites: power, timeline, order-of-magnitude cost.
- A basis to answer tenants and budget your investments.
Proposed format: Portfolio review, three to five weeks depending on site visits. Every assignment is scoped in writing before it starts.
THE KEY EXPERTS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.