DefinitionFor a consumer connected to the distribution grid, at medium voltage or at low voltage above 36 kVA, Enedis issues a connection offer setting out the technical solution, cost and timeline. It plays a role comparable to RTE's PTF and must be accepted within its validity period, or the request leaves the Enedis queue. See Enedis connection for 20 to 30 MW.
WHAT IS AN ENEDIS CONNECTION OFFER?
For a data center of a few megawatts connected at medium voltage, it is the equivalent of the PTF. Its validity period is short: a project that delays acceptance loses its place. The primary substation's capacity often determines what Enedis can offer, and when.
RELATED TERMS
- Primary substation (poste source) : Substation linking the transmission network (HTB) to the distribution network (HTA).
- The 40 MW threshold : Above roughly 40 MW, a project is generally connected by RTE at HTB rather than by Enedis at HTA.
- PTF (proposition technique et financière) : RTE's formal connection offer: solution, works, cost, indicative timeline.
SAME TOPIC
Exploratory study · Queue entry · Annual review · First ready, first served · Connection agreement · Reserved versus firm capacity
← The full grid connection glossary · Our sources
A PROJECT AFFECTED?
Our independent experts apply these notions to your file, with no commission and no brokerage. The expert: Xavier Watrelos.