Typical situation no. 99
An investor is looking at buying a former industrial site marketed as "connected at 40 MVA". Its financial model assumes 40 MW of leasable capacity. Before a firm offer, it wants to know what that figure really means for a data center.
WHAT IS BLOCKING
- MVA are not IT MW: power factor, cooling and losses must be deducted.
- The contractual capacity with the grid operator may be lower than the substation's capacity.
- The substation may be old and need replacing.
WHAT WE DO
- Conversion of MVA into IT MW based on the target PUE and load profile.
- Check of the connection contract and the power actually guaranteed.
- Substation visit: age, condition, extension options.
- Leasable capacity scenarios for the financial model.
WHAT YOU GET
- A realistic IT capacity, with its assumptions.
- The investments to plan for on the substation.
- Quantified arguments to negotiate the price.
Proposed format: Technical review before firm offer, one to two weeks. Every assignment is scoped in writing before it starts.
THE KEY EXPERTS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.