DefinitionGrid operator works (new transformer, line, substation) needed to accommodate the requested power, sometimes far from the site. They can condition the full-power date and need their own permits.
WHAT IS A GRID REINFORCEMENT?
Reinforcements are the main source of gap between the announced date and the real one: they can involve a line or substation far from the site, with their own permits and consultations. You need to know which ones govern each capacity step.
RELATED TERMS
- Grid date : The date when the grid can actually deliver the project's target capacity, step by step.
- Reserved versus firm capacity : A queue position reserves capacity, but the power actually available depends on grid works and reinforcements, sometimes in tranches, with possible operating limitations in between.
- Primary substation (poste source) : Substation linking the transmission network (HTB) to the distribution network (HTA).
SAME TOPIC
HTA and HTB · Customer substation · The 40 MW threshold · MVA · IT MW · Power factor
← The full grid connection glossary · Our sources
A PROJECT AFFECTED?
Our independent experts apply these notions to your file, with no commission and no brokerage. The expert: Xavier Watrelos.