DefinitionRatio of active power (MW) to apparent power (MVA). The closer it is to 1, the more efficiently the connected capacity is used.
WHAT POWER FACTOR FOR A DATA CENTRE?
A low power factor forces the connection and transformers to be oversized for the same useful power. Modern equipment and reactive power compensation bring it closer to 1.
CalculateOur MVA, MW and IT MW converter runs the numbers for your site: connected capacity, power factor, PUE.
RELATED TERMS
- MVA (megavolt-ampere) : Unit of apparent power.
- IT MW (IT load) : Power available to the servers once cooling, electrical losses and auxiliaries are deducted.
- Customer substation (poste de livraison) : The site's own substation at the connection point, paid for by the developer.