DefinitionVoltage levels. HTA (1 to 50 kV, usually 20 kV) is Enedis's distribution network; HTB (above 50 kV: 63, 90, 150, 225 and 400 kV) is RTE's transmission network.
WHAT IS THE DIFFERENCE BETWEEN HTA AND HTB?
The voltage level determines the counterpart (Enedis or RTE), the procedure, the cost and the timeline. A data center of a few megawatts is usually connected at HTA; above roughly 40 MW it generally moves to HTB, with a private customer substation.
RELATED TERMS
- The 40 MW threshold : Above roughly 40 MW, a project is generally connected by RTE at HTB rather than by Enedis at HTA.
- Primary substation (poste source) : Substation linking the transmission network (HTB) to the distribution network (HTA).
- Customer substation (poste de livraison) : The site's own substation at the connection point, paid for by the developer.
SAME TOPIC
Reinforcement · MVA · IT MW · Power factor