DefinitionContract setting the operating rules of the connection between the grid operator and the site.
WHAT IS AN OPERATING AGREEMENT FOR?
It comes in at commissioning and sets how the site and the grid operator interact day to day: switching, contacts, instructions. It is distinct from the connection agreement, which covers the works and their cost.
RELATED TERMS
- Connection agreement (convention de raccordement) : The contract that follows the PTF: scope, cost, schedule and, where relevant, capacity steps.
- CART (transmission network access contract) : Contract governing the operating site's use of the transmission network: metering, subscribed power, access charges.
- TURPE (network use tariff) : Tariff set by the French regulator CRE, paid by users for the use of transmission and distribution networks.
SAME TOPIC
PTF transfer · Use it or lose it · Annual adjustment of connection capacity
← The full grid connection glossary · Our sources