DefinitionContract governing the operating site's use of the transmission network: metering, subscribed power, access charges. Distinct from the PTF and the connection agreement, which cover the connection itself.

WHAT IS THE CART?

The CART covers the site's life once connected. The subscribed power it sets directly drives network charges: oversizing it is costly, undersizing it exposes the site to overrun charges.