Typical situation no. 103
A regional operator has a 6 MW IT site, two-thirds occupied. A customer wants 3 MW of AI racks above 50 kW per rack, delivered within the year. The operator does not know whether its grid connection, substation and cooling can cope, or whether it must ask Enedis for more power.
WHAT IS BLOCKING
- The apparent margin on the electricity contract ignores the redundancy to maintain.
- Air cooling will not be enough for racks of this density.
- A power increase with Enedis may exceed the customer's deadline.
WHAT WE DO
- Survey of real loads and margins: connection, substation, distribution, UPS, generators.
- Analysis of cooling and the liquid option for AI racks.
- Preliminary discussion with Enedis on a possible power increase.
- Scenarios: what is possible without a new connection, and what is not.
WHAT YOU GET
- A realistic AI capacity, with redundancy maintained.
- The timeline and cost of each scenario.
- A reasoned answer to give the customer.
Proposed format: Capacity study, two to three weeks. Every assignment is scoped in writing before it starts.
THE KEY EXPERTS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.