Typical situation no. 103

A regional operator has a 6 MW IT site, two-thirds occupied. A customer wants 3 MW of AI racks above 50 kW per rack, delivered within the year. The operator does not know whether its grid connection, substation and cooling can cope, or whether it must ask Enedis for more power.

WHAT IS BLOCKING

WHAT WE DO

  1. Survey of real loads and margins: connection, substation, distribution, UPS, generators.
  2. Analysis of cooling and the liquid option for AI racks.
  3. Preliminary discussion with Enedis on a possible power increase.
  4. Scenarios: what is possible without a new connection, and what is not.

WHAT YOU GET

Proposed format: Capacity study, two to three weeks. Every assignment is scoped in writing before it starts.

THE KEY EXPERTS

Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

See profile →
Francis Gillard

Francis Gillard

Data center design & audits

See profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.