Land near a high-voltage line is not a connectable site. To compare sites before costly studies, you need a consistent reading and, above all, to know what is confirmed, estimated or unknown.
DOES YOUR SITUATION LOOK LIKE ONE OF THESE?
THE SITE SHEET
Same headings for every site
Location, area and planning
Documented power: installed, subscribed, reserved, requested or confirmed by the grid operator
Connection status and nearby substations, including transmission constraints
HV equipment needed and lead times
Permits, water and cooling, fibre
Local acceptance risk
Realistic schedule
Confidence level for each data point, with sources
Documented power: installed, subscribed, reserved, requested or confirmed by the grid operator
Connection status and nearby substations, including transmission constraints
HV equipment needed and lead times
Permits, water and cooling, fibre
Local acceptance risk
Realistic schedule
Confidence level for each data point, with sources
Each site gets a readiness score built on explicit criteria with its confidence level. It helps rank and compare; it does not guarantee a connection. See land assessment and site checklist.
FREQUENTLY ASKED QUESTIONS
Does a readiness score guarantee grid connection?
No. It helps compare and prioritise. Connection and its date are decided by the grid operator.