Typical situation no. 69
A software company wants to host 2 MW of AI servers in the Paris region for five years. Three providers responded, all "AI-Ready" and "liquid-cooling ready". Prices are close, but their documents cannot be compared.
WHAT IS BLOCKING
- Each provider describes capacity in its own terms and assumptions.
- The in-house team lacks the expertise to check liquid cooling and density paths.
- Five-year cost depends on technical choices the offers do not detail.
WHAT WE DO
- Common comparison grid: power per rack, cooling, available power and date, redundancy.
- Written questions to the three providers and site visits.
- Total cost over the contract term, with foreseeable upgrades.
- Written recommendation and contract points to negotiate.
WHAT YOU GET
- An objective comparison of the three offers.
- A clear line between what is proven and what is promised.
- A reasoned choice and a better-protected contract.
Typical format: Tender support, three to six weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?See all 93 situations →