Typical situation no. 23

A colocation operator has signed with a customer who wants to install 20 GPU racks at 60 kW in a hall designed for 8 to 10 kW racks. Installation is scheduled in five months.

WHAT IS BLOCKING

WHAT WE DO

  1. Audit of the hall: power, cooling, structure, available space.
  2. Comparison of options: active rear-door coolers, direct-to-chip liquid cooling, dedicated zone.
  3. Costing and scheduling of the works, without disrupting existing customers.
  4. Review of the contractual commitments that can be offered to the customer.

WHAT YOU GET

Typical format: Audit and options study, three to four weeks. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Anis Mokded

Anis Mokded

Design, commissioning & operations

View profile →
Geoffrey Garriga

Geoffrey Garriga

Energy compliance & building services

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.