Typical situation no. 65
A European neocloud wants to set up in the Paris region and is negotiating 5 MW in a data center under extension. The operator announces delivery in nine months, 80 kW racks and liquid cooling. The contract carries a five-year commitment.
WHAT IS BLOCKING
- The tenant does not know whether power is connected, requested or merely hoped for.
- Cooling 80 kW racks depends on equipment not yet installed.
- Contract delay penalties are small compared with the tenant's commitment.
WHAT WE DO
- Check of the connection document and the realistic energisation date.
- Review of power and cooling design for the target densities.
- Site visit and review of works progress and equipment orders.
- List of clauses to strengthen: delivery, penalties, expansion, SLAs.
WHAT YOU GET
- An independent view before a five-year commitment.
- Better-protected contract clauses.
- A realistic start date to plan GPU arrival.
Typical format: Pre-lease audit, two to three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?See all 93 situations →