Typical situation no. 68
A developer whose financing failed is looking for a buyer for its 60 MW project: land under option, a connection request with RTE and a permit under review. An interested investor has three weeks to make an offer.
WHAT IS BLOCKING
- The investor does not know whether the connection request can be taken over, or on what terms.
- Commitments already made (land option, studies, orders) are not all transferable.
- The decision window is very short.
WHAT WE DO
- Review of the connection document, deadlines and takeover conditions, with a lawyer.
- Review of the land option, permit and completed studies.
- Inventory of commitments and what is transferable.
- Realistic schedule and takeover cost.
WHAT YOU GET
- An offer based on what really has value.
- Conditions to put to the seller.
- A decision within the deadline.
Typical format: Fast review, two to three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our 12 ha plot is in an AU zone of the local land-use plan (PLU). Can we build a 60 MW data center on it?We are taking over a brownfield site with a former 63 kV substation. Can it be reused for a data center?A small 2 MW regional AI data center: what building to look for, and what power to check before visiting?We want to convert an 8,000 m² logistics warehouse into a data center. Slab, clear height, power: will it work?See all 93 situations →