Typical situation no. 68
A developer whose financing failed is looking for a buyer for its 60 MW project: land under option, a connection request with RTE and a permit under review. An interested investor has three weeks to make an offer.
WHAT IS BLOCKING
- The investor does not know whether the connection request can be taken over, or on what terms.
- Commitments already made (land option, studies, orders) are not all transferable.
- The decision window is very short.
WHAT WE DO
- Review of the connection document, deadlines and takeover conditions, with a lawyer.
- Review of the land option, permit and completed studies.
- Inventory of commitments and what is transferable.
- Realistic schedule and takeover cost.
WHAT YOU GET
- An offer based on what really has value.
- Conditions to put to the seller.
- A decision within the deadline.
Typical format: Fast review, two to three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 68 situations →