Typical situation no. 8

A real estate group is buying a former 25 ha paper mill in eastern France. The site has a 63 kV delivery substation that supplied the plant until 2021, with 18 MW of contracted capacity. The buyer hopes to save several years on the grid connection.

WHAT IS BLOCKING

WHAT WE DO

  1. Verification of the contractual position with the grid operator: contract, capacity, conditions for takeover.
  2. Technical inspection of the substation: transformers, switchgear, protection systems, civil works.
  3. Study of the options: reuse, refurbishment, or a new substation while retaining existing rights.
  4. Recommendations on the steps to take before signing the acquisition.

WHAT YOU GET

Typical format: Desk review and site visit, about three weeks. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.