Typical situation no. 8
A real estate group is buying a former 25 ha paper mill in eastern France. The site has a 63 kV delivery substation that supplied the plant until 2021, with 18 MW of contracted capacity. The buyer hopes to save several years on the grid connection.
WHAT IS BLOCKING
- It is not certain that the connection capacity is retained if the grid access contract has been terminated or if the site has remained inactive.
- The substation equipment is over thirty years old: its condition and compliance are unknown.
- A data center requires a level of redundancy the former substation probably did not provide.
WHAT WE DO
- Verification of the contractual position with the grid operator: contract, capacity, conditions for takeover.
- Technical inspection of the substation: transformers, switchgear, protection systems, civil works.
- Study of the options: reuse, refurbishment, or a new substation while retaining existing rights.
- Recommendations on the steps to take before signing the acquisition.
WHAT YOU GET
- A substation condition report with photos and recommendations.
- An estimate of the capacity actually available and the time needed to obtain it.
- The clauses to include in the acquisition deed.
Typical format: Desk review and site visit, about three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our 12 ha plot is in an AU zone of the local land-use plan (PLU). Can we build a 60 MW data center on it?A small 2 MW regional AI data center: what building to look for, and what power to check before visiting?We want to convert an 8,000 m² logistics warehouse into a data center. Slab, clear height, power: will it work?We are coming from the United States and targeting France. Which region for 50 MW deliverable before 2029?See all 93 situations →