Typical situation no. 10
A regional hosting provider wants to open a 2 MW inference data center, expandable to 4 MW, in Occitanie. It is visiting commercial buildings offered by real estate agents, without knowing which ones can actually receive the power.
WHAT IS BLOCKING
- Listings mention neither available power, nor distance to the primary substation, nor the state of the local grid.
- An attractive building may need two years for its connection, while a less appealing one already has an MV (HTA) substation.
- Ceiling height, floor loading and truck access matter as much as floor area.
WHAT WE DO
- Drafting of a technical brief: power, floor area, structure, access, fibre, surroundings.
- Desk qualification of each candidate building before any visit.
- Visit to the two or three best sites with an expert.
- Initial discussion with Enedis on the selected site.
WHAT YOU GET
- A brief to send to agents and local authorities.
- A qualification sheet for each candidate site.
- A reasoned ranking of the sites.
Typical format: Fixed-fee engagement: technical brief, then site-by-site qualification. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our 12 ha plot is in an AU zone of the local land-use plan (PLU). Can we build a 60 MW data center on it?We are taking over a brownfield site with a former 63 kV substation. Can it be reused for a data center?We want to convert an 8,000 m² logistics warehouse into a data center. Slab, clear height, power: will it work?We are coming from the United States and targeting France. Which region for 50 MW deliverable before 2029?See all 93 situations →