Typical situation no. 10
A regional hosting provider wants to open a 2 MW inference data center, expandable to 4 MW, in Occitanie. It is visiting commercial buildings offered by real estate agents, without knowing which ones can actually receive the power.
WHAT IS BLOCKING
- Listings mention neither available power, nor distance to the primary substation, nor the state of the local grid.
- An attractive building may need two years for its connection, while a less appealing one already has an MV (HTA) substation.
- Ceiling height, floor loading and truck access matter as much as floor area.
WHAT WE DO
- Drafting of a technical brief: power, floor area, structure, access, fibre, surroundings.
- Desk qualification of each candidate building before any visit.
- Visit to the two or three best sites with an expert.
- Initial discussion with Enedis on the selected site.
WHAT YOU GET
- A brief to send to agents and local authorities.
- A qualification sheet for each candidate site.
- A reasoned ranking of the sites.
Typical format: Fixed-fee engagement: technical brief, then site-by-site qualification. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 50 situations →