Typical situation no. 11
A warehouse owner has an 8,000 m² building near Marseille that has been empty for a year. An operator has offered to lease it and install "box-in-box" data halls. The owner wants to know what the conversion will cost before signing a twelve-year lease.
WHAT IS BLOCKING
- A logistics slab is designed for distributed loads, not necessarily for 1.5-tonne GPU racks resting on a few feet.
- The roof and facade must accommodate the chillers, and the surrounding area the generators and fuel storage.
- The existing site's power supply rarely exceeds a few hundred kilowatts.
WHAT WE DO
- Technical site visit: structure, slab, clear height, roof, access, neighbours.
- Check of grid capacity and connection options.
- Outline layout: data halls, electrical rooms, cooling, generators, storage.
- Estimate of the works to be borne by the owner and by the operator.
WHAT YOU GET
- A feasibility report with an outline layout plan.
- The list of works and their order of magnitude.
- The technical clauses to include in the lease.
Typical format: Feasibility study, three to four weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our 12 ha plot is in an AU zone of the local land-use plan (PLU). Can we build a 60 MW data center on it?We are taking over a brownfield site with a former 63 kV substation. Can it be reused for a data center?A small 2 MW regional AI data center: what building to look for, and what power to check before visiting?We are coming from the United States and targeting France. Which region for 50 MW deliverable before 2029?See all 93 situations →