Typical situation no. 6
A European investor is targeting 300 MW in France. It is weighing a bid for one of the five accelerated sites identified by the State and RTE against a private site in Grand Est offered by a local developer, with an exploratory study in hand.
WHAT IS BLOCKING
- Fast-track sites promise three to four years for a 400 kV connection, but competition is strong and the award conditions are demanding.
- The standalone site is available immediately, but its grid schedule has yet to be confirmed.
- The two options differ in land cost, acceptability risk and fibre access.
WHAT WE DO
- Comparison grid on six criteria: grid, land, permits, acceptability, connectivity, total cost.
- Analysis of each option's grid schedule and its uncertainties.
- Review of the access conditions for fast-track sites.
- Visit to the standalone site if the desk analysis is favourable.
WHAT YOU GET
- A costed, reasoned decision matrix.
- The conditions to obtain for each option before committing.
- A recommendation ready to present to the executive committee.
Typical format: Comparative study, three to four weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 50 situations →