Typical situation no. 70

A family owns 35 hectares of farmland a few kilometres from a high-voltage substation. A data center developer proposes a sale option, subject to obtaining grid connection and a permit, valid for three years. The price looks high for farmland, but the family does not know what the land would be worth once powered, or what it risks by tying it up for three years.

WHAT IS BLOCKING

WHAT WE DO

  1. Reading of the land's potential: accessible power, planning, constraints, timeline.
  2. Technical review of the option: conditions, duration, compensation, developer strength.
  3. Comparison of paths: accept, renegotiate, or prepare the land before selling.
  4. Costed roadmap of value-creating steps if the family chooses to prepare.

WHAT YOU GET

Typical format: Advisory assignment, three to four weeks. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

View profile →
Frédéric Arnaud

Frédéric Arnaud

Founder & coordinator

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.