Typical situation no. 47
A battery storage developer has filed a 50 MW grid connection request in western France. The target substation is in high demand. Investors are waiting for a commissioning date to close the financing.
WHAT IS BLOCKING
- Battery connection requests are multiplying and saturating some substations.
- Connection terms may include power limitations at certain hours.
- The business model depends directly on the date and on the injection and withdrawal conditions.
WHAT WE DO
- Analysis of the target substation and nearby alternatives.
- Review of the connection terms offered or achievable.
- Strategy: maintain, modify or relocate the request.
- Preparation of discussions with the grid operator.
WHAT YOU GET
- A grid connection strategy note.
- The impact of the connection terms on the business model.
- A roadmap of next steps.
Typical format: Advisory assignment, two to three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 93 situations →