Typical situation no. 47
A battery storage developer has filed a 50 MW grid connection request in western France. The target substation is in high demand. Investors are waiting for a commissioning date to close the financing.
WHAT IS BLOCKING
- Battery connection requests are multiplying and saturating some substations.
- Connection terms may include power limitations at certain hours.
- The business model depends directly on the date and on the injection and withdrawal conditions.
WHAT WE DO
- Analysis of the target substation and nearby alternatives.
- Review of the connection terms offered or achievable.
- Strategy: maintain, modify or relocate the request.
- Preparation of discussions with the grid operator.
WHAT YOU GET
- A grid connection strategy note.
- The impact of the connection terms on the business model.
- A roadmap of next steps.
Typical format: Advisory assignment, two to three weeks. Every assignment is scoped in writing before it starts.