Typical situation no. 47

A battery storage developer has filed a 50 MW grid connection request in western France. The target substation is in high demand. Investors are waiting for a commissioning date to close the financing.

WHAT IS BLOCKING

WHAT WE DO

  1. Analysis of the target substation and nearby alternatives.
  2. Review of the connection terms offered or achievable.
  3. Strategy: maintain, modify or relocate the request.
  4. Preparation of discussions with the grid operator.

WHAT YOU GET

Typical format: Advisory assignment, two to three weeks. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.