Typical situation no. 60

A developer has a 17 MW solar project connected at medium voltage. In October 2026 the French government announced a derogation allowing up to 25 MW to be installed with storage, provided export never exceeds 17 MW. The developer wants to know whether to rework the project now.

WHAT IS BLOCKING

WHAT WE DO

  1. Review of the project's position: connection, contracts, permits.
  2. Sizing of an oversized version with storage.
  3. Economic comparison of both versions, with assumptions.
  4. Monitoring of implementing texts and points to check.

WHAT YOU GET

Typical format: Sizing study, two to four weeks. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Bertrand Grivelet

Bertrand Grivelet

Battery storage & solar

View profile →
Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.