Typical situation no. 59
A producer operates a plant connected to RTE's grid. It is considering a data center on the same site, possibly with battery storage, and wonders whether it can rely on its existing connection.
WHAT IS BLOCKING
- An export connection does not automatically give import rights.
- Sharing capacity between generation, storage and consumption follows precise rules.
- The business case depends on network tariffs and power sales contracts.
WHAT WE DO
- Analysis of the existing connection and the steps required with RTE.
- Study of possible configurations: consumption only, with generation and storage.
- First sizing of storage and its role.
- Roadmap of steps and timeline.
WHAT YOU GET
- A clear answer on what can be reused.
- Possible connection configurations and their consequences.
- A realistic timeline.
Typical format: Feasibility study, three to five weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.