DefinitionJoint Enedis and RTE platform piloted since 1 September 2026 in eight southern French departments, bringing local flexibility tenders together. See our storage page.
WHAT IS THE ENEDIS AND RTE PORTAIL FLEXIBILITÉS?
For a site with batteries or able to modulate its load, these tenders can become a revenue source. It is still a local pilot: check whether the site lies in a covered area.
RELATED TERMS
- Hybrid supply : Combining several sources (grid, solar, batteries, on-site generation) to supply a site or smooth its demand.
- Bridging power : On-site generation (gas engines, batteries, generators) supplying all or part of a data centre until the grid connection arrives.
- S3REnR : Regional plan for connecting renewable generation, with a share paid by producers.
SAME TOPIC
HTB3 fast-track procedure · Project of major national interest · Documentation technique de référence
← The full grid connection glossary · Our sources
A PROJECT AFFECTED?
Our independent experts apply these notions to your file, with no commission and no brokerage. The expert: Bertrand Grivelet.