DefinitionCombining several sources (grid, solar, batteries, on-site generation) to supply a site or smooth its demand.

WHAT IS HYBRID SUPPLY FOR A DATA CENTRE?

Hybrid supply can reduce the power drawn from the grid or cover a transition period. Each source adds its own constraints: its own connection, permits, maintenance and control.

RELATED TERMS

SAME TOPIC

Tier

← The full grid connection glossary · Our sources

A PROJECT AFFECTED?

Our independent experts apply these notions to your file, with no commission and no brokerage. The expert: Bertrand Grivelet.

Storage, solar and on-site power →