DefinitionRegional plan for connecting renewable generation, with a share paid by producers. It does not apply to consumption sites such as data centers.
DOES THE S3RENR APPLY TO DATA CENTERS?
Not for consumption, but it matters if the project pairs on-site renewable generation, such as a solar plant. The two connections must then be kept apart: the consumption one and the generation one.
RELATED TERMS
- Hybrid supply : Combining several sources (grid, solar, batteries, on-site generation) to supply a site or smooth its demand.
- Portail Flexibilités : Joint Enedis and RTE platform piloted since 1 September 2026 in eight southern French departments, bringing local flexibility tenders together.
- Documentation technique de référence (DTR) : RTE's published rules, including the connection request procedure approved by CRE.
SAME TOPIC
HTB3 fast-track procedure · Project of major national interest
← The full grid connection glossary · Our sources