DefinitionSolar plant output exceeded with a 50% or 90% probability. Lenders often size debt on P90.
WHAT DO P50 AND P90 MEAN FOR A SOLAR PLANT?
For a data centre paired with a solar plant, the share of energy covered should be estimated on P90 rather than P50: that is the assumption the lender will use.
RELATED TERMS
- Hybrid supply : Combining several sources (grid, solar, batteries, on-site generation) to supply a site or smooth its demand.
- Bridging power : On-site generation (gas engines, batteries, generators) supplying all or part of a data centre until the grid connection arrives.
- Technical due diligence : Independent check, before an investment or a loan, of what drives a project's delivery: grid connection, equipment, permits, timeline.
SAME TOPIC
Condition precedent · Debt service coverage ratio · Carrying cost · Compute ordered vs compute installed
← The full grid connection glossary · Our sources
A PROJECT AFFECTED?
Our independent experts apply these notions to your file, with no commission and no brokerage. The expert: Bertrand Grivelet.