Typical situation no. 94
A broker is placing construction all risks cover for a 60 MW data center, with delay-in-start-up cover. Insurers want a credible energisation date. The insured's file contains an RTE connection offer and a schedule, but nobody has checked whether they are consistent.
WHAT IS BLOCKING
- The energisation date in the schedule does not necessarily match the works in RTE's offer.
- Transformers and high-voltage switchgear have manufacturing lead times that can exceed the building's.
- Insurers have no specialist engineer to read a grid connection offer.
WHAT WE DO
- Review of the grid connection offer, its milestones and conditions.
- Comparison with the construction schedule and the status of high-voltage equipment orders.
- Site visit and interview with the insured's project team.
- Assessment of delay risk, by cause and order of magnitude.
WHAT YOU GET
- A written report for the broker and insurers, in English or French.
- A realistic energisation date, with its main uncertainties.
- Recommendations to request from the insured before underwriting.
Proposed format: Technical review and site visit, two to three weeks. Every assignment is scoped in writing before it starts.
THE KEY EXPERTS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.