Typical situation no. 32
A fund is considering the acquisition of a 6 MW data center. The seller presents a plan that increases revenue by 30% by leasing part of the halls to AI customers, "with no significant investment".
WHAT IS BLOCKING
- Denser racks require more power per hall, different cooling and sometimes a different structure.
- The announced spare power capacity may already be contractually reserved for existing customers.
- This assumption shifts the valuation by several million euros.
WHAT WE DO
- Analysis of installed, consumed and contractually reserved power.
- Assessment of cooling and power distribution capacity per hall.
- Costing of the works actually required for the announced densification.
- Opinion on the business plan assumption.
WHAT YOU GET
- A clear note: the assumption is sound, needs correcting, or is unrealistic.
- The budget and timeline for the required works.
- The adjustments to make to the financial model.
Typical format: Targeted review, two weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
We are financing 60 MW. The sponsor says it has a signed connection offer (PTF). What is it really worth?Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?Our fund is classified Article 9. Which data center metrics can we actually document?Ahead of an acquisition, we have four weeks to complete the technical review of an operating 12 MW site.See all 50 situations →