Typical situation no. 85

A foreign company is completing a grid-connected solar plant in France. It knows the technology, but not French procedures or local contacts. The commissioning date is getting close.

WHAT IS BLOCKING

WHAT WE DO

  1. Review of connection progress and the documents the grid operator expects.
  2. Pre-commissioning checks and tests of the installation.
  3. Coordination of commissioning with the grid operator.
  4. Technical acceptance and completion file.

WHAT YOU GET

Typical format: Commissioning assignment, depending on the size of the installation. Every assignment is scoped in writing before it starts.

THE EXPERTS FOR THIS

Etienne Sauvage

Etienne Sauvage

Solar PV, off-grid sites & commissioning

See profile →
Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

See profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.