Typical situation no. 85
A foreign company is completing a grid-connected solar plant in France. It knows the technology, but not French procedures or local contacts. The commissioning date is getting close.
WHAT IS BLOCKING
- The grid operator's connection and commissioning steps have their own requirements and documents.
- Tests and acceptance must be carried out and documented under French rules.
- Exchanges take place in French, with contacts the company does not know.
WHAT WE DO
- Review of connection progress and the documents the grid operator expects.
- Pre-commissioning checks and tests of the installation.
- Coordination of commissioning with the grid operator.
- Technical acceptance and completion file.
WHAT YOU GET
- Commissioning carried out under French rules.
- A French- and English-speaking point of contact.
- A complete acceptance file.
Typical format: Commissioning assignment, depending on the size of the installation. Every assignment is scoped in writing before it starts.