Typical situation no. 86
The owner of a ground-mounted plant finds, after two years of operation, that production is below forecast. The operator blames the weather, the contractor denies any defect, and the lender is asking for explanations.
WHAT IS BLOCKING
- Each party reads the figures its own way.
- The gap may come from the installation, the irradiation or the original assumptions.
- Without an independent measurement, discussions with the contractor and insurer stall.
WHAT WE DO
- Analysis of production and irradiation data.
- Inspection and instrumentation of the installation to measure its real performance.
- Comparison with the original yield study (P50, P90).
- Expert report usable by the owner, its advisers and its insurer.
WHAT YOU GET
- The cause of the gap, documented.
- Corrective actions and their expected effect.
- A basis for discussion with the contractor and the lender.
Typical format: Technical expert review, three to six weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.