Typical situation no. 9

The permanent connection of a 20 MW site is scheduled in four years. To host a first customer from 2027, the developer is considering a temporary, rented 8 MW gas-fired plant until the grid arrives.

WHAT IS BLOCKING

WHAT WE DO

  1. Comparative economic model: temporary plant, waiting for the grid, or a different project phasing.
  2. Inventory of the required permits and their lead times.
  3. Analysis of operating constraints: redundancy, maintenance, fuel, switchover to the grid.
  4. Recommendations for negotiating the rental contract.

WHAT YOU GET

Typical format: Opportunity study, two to three weeks. Every assignment is scoped in writing before it starts.