Typical situation no. 63

A warehouse developer has 8 hectares in a business park near a major city. An operator is interested in a building delivered with its power supply. The developer does not know what capacity it can promise or what the operator will expect.

WHAT IS BLOCKING

WHAT WE DO

  1. Analysis of connectable capacity and preparation of the connection request.
  2. List of usual operator requirements: redundancy, technical areas, cooling.
  3. Review of planning, permit and ICPE file.
  4. Preparation of a credible presentation file for the operator.

WHAT YOU GET

Typical format: Feasibility study, four to six weeks. Every assignment is scoped in writing before it starts.