Typical situation no. 63
A warehouse developer has 8 hectares in a business park near a major city. An operator is interested in a building delivered with its power supply. The developer does not know what capacity it can promise or what the operator will expect.
WHAT IS BLOCKING
- Project value depends on power and its date, which the developer does not yet control.
- Data center operator requirements are very different from logistics ones.
- Permit, ICPE and neighbours must be anticipated from the first sketch.
WHAT WE DO
- Analysis of connectable capacity and preparation of the connection request.
- List of usual operator requirements: redundancy, technical areas, cooling.
- Review of planning, permit and ICPE file.
- Preparation of a credible presentation file for the operator.
WHAT YOU GET
- Capacity and a timeline you can defend with the operator.
- A requirements brief for design.
- A presentable project, without promises you cannot keep.
Typical format: Feasibility study, four to six weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
I own 20 ha of land near a 400 kV line. Is it worth anything for a data center?Our 50 MW / 100 MWh storage project is waiting for a grid connection offer. How do we avoid the queue?We are an energy producer and want to add a data center to one of our sites. Can we reuse our grid connection?Our 17 MW solar plant could go to 25 MW with storage. Is it worth it?See all 64 situations →