Typical situation no. 63
A warehouse developer has 8 hectares in a business park near a major city. An operator is interested in a building delivered with its power supply. The developer does not know what capacity it can promise or what the operator will expect.
WHAT IS BLOCKING
- Project value depends on power and its date, which the developer does not yet control.
- Data center operator requirements are very different from logistics ones.
- Permit, ICPE and neighbours must be anticipated from the first sketch.
WHAT WE DO
- Analysis of connectable capacity and preparation of the connection request.
- List of usual operator requirements: redundancy, technical areas, cooling.
- Review of planning, permit and ICPE file.
- Preparation of a credible presentation file for the operator.
WHAT YOU GET
- Capacity and a timeline you can defend with the operator.
- A requirements brief for design.
- A presentable project, without promises you cannot keep.
Typical format: Feasibility study, four to six weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our 12 ha plot is in an AU zone of the local land-use plan (PLU). Can we build a 60 MW data center on it?We are taking over a brownfield site with a former 63 kV substation. Can it be reused for a data center?A small 2 MW regional AI data center: what building to look for, and what power to check before visiting?We want to convert an 8,000 m² logistics warehouse into a data center. Slab, clear height, power: will it work?See all 93 situations →