Typical situation no. 18

The lease for a 12 MW site provides for a level 5 test: cutting the grid supply under full simulated load and checking that the UPS, generators and cooling take over without interruption. No one on the owner's team has ever run such a test.

WHAT IS BLOCKING

WHAT WE DO

  1. Drafting or review of the test protocol, scenario by scenario.
  2. Check of prerequisites: lower-level tests, settings, load banks, teams.
  3. Dry run and check of hold points.
  4. Management of the test and drafting of the report.

WHAT YOU GET

Typical format: Preparation over two to three weeks, then presence during the test. Every assignment is scoped in writing before it starts.