An industrial group wants to build its own 8 MW data center for its needs and a few customers. Its real estate team knows building projects but has never built a data center. Management wants to tender for design firms within two months.
WHAT IS BLOCKING
- Without a precise brief, design firm bids will not be comparable.
- Redundancy and cooling choices weigh heavily on cost and future operations.
- Long-lead equipment must be anticipated even before detailed design.
WHAT WE DO
- Writing the brief: capacity, phasing, redundancy, cooling, operations.
- Preparation and management of the design firm tender.
- Bid analysis and selection support.
- Early procurement plan for long-lead equipment.
WHAT YOU GET
- A clear brief shared by management and future operators.
- Comparable bids and a reasoned choice.
- A schedule that accounts for equipment lead times.
Typical format: Owner-side assignment, six to ten weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 64 situations →