DefinitionRatio of the site's total energy to the energy used by IT equipment. A PUE of 1.0 would be a site with no overhead at all (cooling, electrical losses).

WHAT IS A DATA CENTER'S PUE?

PUE links connected capacity to the IT MW that can actually be leased: the higher it is, the more electricity goes to cooling and losses. It is also reported every year by sites of 500 kW and above.

CalculateOur MVA, MW and IT MW converter runs the numbers for your site: connected capacity, power factor, PUE.